Zoning Checklist

Overview

  • Address/Legal description/Survey provided (as needed)
    • Plat (if applicable)
  • Is project in the City limits, or Metro Planning Area?
  • Zoning district - Allowable use/ variance
  • Development Review Team: Pre-Development Meeting Required
  • Utility Advisor Board review required - new mains, easements
  • Historical property or Historical District, SHPO Review
  • In Floodplain, 1%, .2%, Floodway
  • Easements/Utility services across another property

Parcel Requirements

  • Lot area - minimum required
  • Building size - intensity
  • Exterior Lighting
  • Exterior storage, Fences, Screening, Plantings

Setbacks

  • Front yard setback - Platted, Street Class, Exception, Sight triangle
  • Side yard setback - Corner Lot
  • Rear yard setback
  • Height - district requirement, variance

Parking

  • Off-street parking analysis, occupancy number, use ratio, stall number, flow
  • Parking - surfacing, number of stalls, stall size, detail, aisle width
    • Americans with Disabilities Act (ADA) stalls - 1 HC stall/25, curb stops, 5-foot landing area, 9-foot stall with 5-foot aisle

Other

  • Signs - number, size, location, permit
  • Landscaping - analysis, interior trees, plans
  • Sight triangle - Corner Lots